In Novigrad, just 1 km from the city center and beautiful beaches, 2 residential buildings with 8 apartments each are under construction.
Construction started in early March 2024, and the expected completion date is May 2025. The buildings are harmonious, attractive, and modern in character, designed to meet all the needs of a modern lifestyle.
The apartments are in the final phase and ready for occupancy.
Various apartment typologies are offered: on the ground floor with a yard and on the upper floors with large loggias and a beautiful sea view.
The apartment layouts range from smaller ones with one bedroom to the largest with three bedrooms.
Each apartment has its own parking space and a separate storage room.
On this link, you will find information about the apartment ("2-L") located on the 2nd floor of building B.
The residential area of the apartment is 98.80 m², which includes an entrance hall, living room and kitchen, 2 bedrooms, 2 bathrooms, and a storage/pantry where you can also place a washing machine, dryer, and other household appliances used daily.
The apartment has a covered terrace of 19.50 m² with an outdoor kitchen and space for a large table.
The apartment also includes an external storage room of 6.90 m² and 2 parking spaces of 12.5 m² each.
To get an impression of the construction quality and the selection of finishing materials, please pay attention to the text below, where characteristics and materials are described in detail.
You will understand that the investor had a very clear vision of the product they want to offer to the demanding Istrian real estate market, hoping to attract even the most discerning clients through quality and expertise.
For any additional questions, feel free to contact us.
With trust, Yours Casa Vita
Characteristics and materials:
CONSTRUCTION
• reinforced concrete load-bearing walls
• reinforced concrete monolithic floor slabs
• partition walls made of 10 cm block bricks or double-sided gypsum boards filled with mineral wool (enhanced sound insulation)
EXTERNAL JOINERY
aluminum external joinery with double glazed insulated glass
• panoramic glass walls
• large-format glass walls on loggias
• sun protection – aluminum blinds with electric motor drive
• all openings without sills
GARAGES AND PARKING SPACES
main entrance ramp with electric motor and remote control
• garage doors with remote control
• walls smoothed and painted with semi-dispersive paint
• floor covering – first-class ceramic tiles
• natural ventilation
• hydrant network
• video surveillance and fire alarm
• open parking fully covered
• preparation for electric vehicle chargers
DOORS
• anti-burglary entrance doors
• interior room doors 210 cm high
• larger fully glazed entrance doors to the building
• pedestrian entrance gate
SANITARY FACILITIES
• high-quality sanitary equipment from renowned manufacturers
• showers with cabin
• wall-mounted sanitary ware (toilet, washbasin)
• bathroom cabinets
• built-in flushing cisterns
• single-lever faucets
• wall covering – first-class ceramic tiles
COVERINGS
• WALLS: finishing – smoothing and painting with semi-dispersive white paint
• FLOORS: oak parquet flooring of first class in bedrooms; in other parts of the apartment, bathrooms, loggias, and ground floor terraces large-format first-class ceramic tiles
• TERRACES and LOGGIAS: PVC decking with wood imitation
• CEILINGS: flat ceiling painted with semi-dispersive white paint
HEATING AND COOLING
• Heating and cooling via DAIKIN multisplit system of indoor and outdoor units
• Preparation for underfloor heating throughout the apartment
• Circulation pumps for hot water throughout the apartment
• Individual thermostats and temperature control for each room
• remote control of heating and cooling system via smartphone
• outdoor units located on the roof of the building, for ground floor apartments on green areas
ELECTRICAL INSTALLATIONS
• color video intercom system
• optical fiber cable brought to each apartment
• built-in ceiling lighting fixtures in hallways, terraces, and parking, as well as decorative building lighting
SOLAR PANELS
• First phase of solar panel installation for each apartment completed
ENVIRONMENT
• Landscaped horticulture with automatic irrigation system, separately for ground floor apartments and common areas
• Paved pedestrian and vehicle areas in the surroundings
ADDITIONAL CONTENT AND AMENITIES
• Designed energy efficiency category A+
• Waste disposal in special rooms in the basement
• Secured special space for bicycle storage
• Video surveillance of the entrance area
• Preparation for fireplace in each apartment
OTHER
• 10-year warranty on construction, 2 years on construction and craft works, and war