Okrug Gornji, penthouse apartment, new construction, roof terrace, swimming pool, 85 m2
Residential building newly constructed in Okrug Gornji with eight apartments, two per floor. Apartment S8 penthouse is available on the second floor, consisting of a living room and kitchen as one unit, hallway, entrance hall, two bedrooms, two bathrooms, and a covered terrace. The apartment also includes two outdoor parking spaces and a beautiful rooftop terrace with its own entrance doors and installed electrical wiring, hot and cold water, drainage, TV, satellite, and internet outlets, as well as ambient LED lighting. The owner will be able to install a jacuzzi, pergola, sun loungers, summer kitchen, electric grill, and solar panels for water heating according to their wishes.
The building is served by an elevator, and all residents will have access to the swimming pool and sunbathing area within the property complex. In brief:
Apartment S8 (second floor): 55.46 m2 indoor space, 14.63 m2 covered terrace, 2 parking spaces, 70.40 m2 rooftop terrace, totaling 85.37 m2 net living area, at a price of €420,000.
The apartment is built to the highest standards and is exceptionally equipped, including air conditioning in every room, underfloor heating throughout the apartment (with separate regulation for each room), excellent PVC joinery with double Low-E insulated glass with extremely low energy emission (with additional options for mosquito nets and shutters), modern ceramic tiles in all rooms, excellently equipped bathrooms (wall-hung toilet with built-in cistern, walk-in shower cabin with glass walls, boiler), video intercom, first-class hydro and thermal insulation (8cm polystyrene), and burglar- and fire-resistant entrance doors.
Installations for connection to the sewage network will also be prepared as soon as it becomes available.
The apartment is located in a very attractive location, slightly elevated with a fantastic sea view. All additional amenities, along with the sea and the beach, are nearby.
The planned completion of construction works and occupancy is summer 2026.