Extremely attractive residential building on four floors in a new development in Okrug Gornji, on the island of Čiovo, with a total of 17 apartments. Available are apartments S6, S8, and S10 on the ground floor, consisting of a living room, dining room, and kitchen as one open space, entrance area, two bedrooms, two bathrooms, and a laundry/storage room. The apartments also include balconies, a garage parking space, and a basement storage room. Individual apartments (ground floor):
Apartment S6: two bedrooms, two bathrooms, 73.63 m2 interior space, 7.33 m2 and 9.15 m2 covered balconies, 5.40 m2 basement storage, which together with the garage space provides 90.82 m2 net living area at a price of €327,000;
Apartment S8: two bedrooms, two bathrooms, 73.49 m2 interior space, 7.33 m2 and 9.15 m2 covered balconies, 6.10 m2 basement storage, which together with the garage space provides 91.03 m2 net living area at a price of €328,000;
Apartment S10: two bedrooms, two bathrooms, 73.89 m2 interior space, 9.15 m2 covered balcony, 4.20 m2 basement storage, which together with the garage space provides 86.82 m2 net living area at a price of €312,000.
The apartments are built to the highest standards and are equipped with exceptional quality, including air conditioning in every room, underfloor heating in bathrooms and living rooms, first-class PVC joinery with triple-glazed insulated glass, insect screens on all windows and balcony doors, electric shutters, video surveillance and video intercom, premium ceramics and sanitary ware (with the option to choose), excellent parquet flooring in bedrooms, top hydro and thermal insulation (10 cm stone wool), burglar-proof and fire-resistant entrance doors, and even remote opening of stairwell doors via mobile phone.
The building has two entrances, so each apartment on every floor will have only one neighbor.
The apartments are located in a slightly elevated position, close to the sea and the beach, and feature a sea view. All accompanying amenities are nearby. The building permit has been obtained and construction works are underway. The planned completion of construction and occupancy is by the end of 2025.