We present to you a project of luxury apartments in the residential part of Novigrad, right by the sea and other facilities. Novigrad is well connected with all parts of Istria, as well as with neighboring countries, and the highway is only a 5-minute drive away. The building is located on the highest point of Vidal, surrounded by new buildings overlooking the sea. In this luxury residential complex is a three-room apartment on the 1st floor of the building. The apartment has a closed living area of 81.3 m2. With a covered terrace (10.15 m2), storage room (2.93 m2), parking space (2.50 m2) it totals 96.88 m2 of area. The apartment consists of: hallway, living room with kitchen and dining room, two bedrooms with bathrooms, wardrobe, storage room, covered terrace. The apartment has a garage parking space and storage room. APARTMENT INTERIOR: Interior: A combination of aesthetics, functionality and comfort. The modern style is aligned with the latest trends in interior design, with an emphasis on decent and unobtrusive details enriched with warm shades of natural colors. Smaller apartments have two bedrooms and one bathroom, while larger apartments have two bedrooms with bathrooms and a separate toilet. In all apartments, regardless of the area, the living room is an open plan that connects the kitchen, dining room and living room into one unit with access to a spacious terrace. In addition to comfort, great attention is also paid to the safety of the building. All apartments have built-in security and fire doors, while the triple-layer aluminum windows have automatic blinds and shutters on the loggias. The combination of traditional materials and modern design leaves an impression of luxury emphasized by details such as high ceilings, quality bathroom ceramics, elegant "filomuro" interior doors and large-format wooden parquet. Such an interior, in a natural texture and warm shades, unobtrusively exudes a warm welcome, while clean and straight lines with large, glass surfaces further emphasize the spaciousness. The completion of construction is expected in 2025.