The new villa in the resort under construction (B18) consists of a ground floor with a kitchen and dining area that opens onto a terrace and pool, a living room, one bedroom, a bathroom, and a laundry room, while the first floor features two bedrooms, each with its own private bathroom and balcony. The resort offers luxurious living with a wellness and center, fitness center, children's area, café bar, wine bar, and an electric car charging station. The apartments are sold turnkey, without furniture. Construction began in September 2023, and the resort will be ready by summer 2025. The villa is equipped with underfloor heating via a heat pump, and cooling is provided by air conditioning. Everything here is designed and planned to make life luxurious and comfortable. Within the complex, you can feel safe as the settlement is under video surveillance. The villa includes two parking spaces.