Modern residential building in new construction in Brodarica near Šibenik, with six apartments on three floors, part of an attractive gated complex of four buildings. Apartment S1 on the first floor is available and consists of a living room, dining room and kitchen as one unit, two bathrooms, a hallway, three bedrooms and two covered terraces. In brief:
Apartment S1 (first floor): 91.25 m2 of interior space, covered terraces of 12.87 and 4.22 m2, a total of 102.30 m2 of net living area with coefficients included. The price is €429,660.
The apartment also includes one outdoor parking space, with the possibility of purchasing a garage space. The apartment also offers a sea view.
The building is being constructed to modern standards, from very high-quality materials and with all necessary equipment and features. The apartment includes top-quality air conditioning units in all rooms, underfloor heating in the bathrooms and living room, anti-burglary and fireproof doors, first-class hydro and thermal insulation (with an expected A energy rating), exterior aluminum joinery with triple-glazed insulated glass, excellent parquet flooring in the bedrooms, quality tiles, and electric shutters. There are also many details that add extra value to the property, such as mosquito screens on all openings, a built-in chimney with the possibility of connecting a wood-burning stove, or a mounted and protected socket at the parking space for charging an electric car or washing the car. This goes so far into detail that, for example, the mailboxes are exceptionally aesthetically designed and recessed into the wall structure instead of being conventionally mounted on its surface.
The building is located in an exceptional location, very close to the new and fully landscaped Rezalište beach with all accompanying facilities and attractions. Nearby is the Amadria hotel resort with numerous amenities, a large aqua park and beautiful beaches, and the island of Krapanj is also very close, offering peace and relaxation.
The planned completion of construction and move-in date is the end of 2027.